Cut out any loose sections of vinyl with a utility knife.
Tiling bathroom floor toilet flange.
Large bolts thread up through the holes with their heads facing the floor in the drain flange on each.
The installation process is the same for a tile floor a hardwood or carpeted bathroom floor.
Step 1 seal the drain hole before you start work stuff a large wad of old towels or newspaper into the drain hole in the floor bordered by the toilet flange to keep sewer gas from rising into the room as well as to prevent tools and fasteners from falling into the drain.
When the toilet is reinstalled its base will rest squarely on the new floor and cover any edges around the flange leaving your project with a professional appearance.
With the toilet removed you can carry the tile all the way up to and around the toilet flange.
Follow the directions provided below to set the toilet ring into the flange after tiling the floor.
Tile the areas away from the toilet flange first.
You ve finished tiling and now what do you do about the toilet flange.
How to change the height of a toilet flange after tiling in a remodel situation.
The spacing of the toilet exit horn and sealing surface is designed for this height.
The stripper will dissolve wax.
Purchase a toilet flange extension ring thick enough to raise the toilet mounting surface so that it s approximately 1 4 inch above the level of the finished tile floor.
Fill the void with thin set using the flat edge of a notched.
Scrub the floor with a vinyl floor stripper following the manufacturer s instructions.
Don t tile around the toilet flange the circular piece that connects to the drain pipe and upon which the toilet itself will rest until the end.
The toilet flange needs to be on top of the finished floor.
Meaning the bottom edge of the flange needs to be on the same plane as the toilet.
So if your toilet sits on the tile the flange needs to be on top of the tile too.
Next drive screws through the floor into the joists.
When tiling a bathroom mark out your desired grid pattern on the floor and lay tile over the unobstructed areas first.
Clean the top of the.