Use a hacksaw to.
Tile shower door installation.
How to tile a shower like we show here will take you about four full days.
How to install shower doors on tile step 1.
Measure the inside width of the shower at the top surface of the tub ledge from wall to wall.
The shower tiling alone will take two days.
Place the glass clamp sweep into place on the door s bottom edge and secure it at the door clamp.
Turn over the trowel to the notched side and comb over in one direction.
Attach the door handles and any towel bars.
Our shower doors are customized for your space so having a new one ordered fabricated and delivered could take up to 3 weeks.
If you want fancy glass tile accents like the ones we show brace yourself.
Shower tile and shower tiling supplies will cost about 600 if you choose standard tile.
Tap a plastic anchor into the pre drilled holes in the tile image 3.
However the actual installation of your new shower door can be completed by our professional installers in 2 3 hours.
Make sure that all of your measurements are level and figure out exactly where the hinges for the door will be going.
Put it in place and tape it down until the side rails are in place image 2.
Run a bead of silicone on the underside of the threshold piece image 1.
Place end caps on the tops of the wall channels.
Follow the steps necessary to determine where the holes need to be for your anchors.
Run a damp sponge over the backer board in the area you intend to tile.
Clean the tile surface with a household cleaner to remove any film or dirt from the tub ledge and tile surfaces.
Continue reading below our video of the day.
Use a small amount of the excess mortar and spread it onto the back of a tile with the notched.
Make a mark on the tile for the spots where you will be drilling.