Honestly while it could work i d have some worry about it.
Tile one wall at a time.
Put on a pair of safety goggles before you start removing the tile then place the chisel at a 45 degree angle between the tiles and hit the end of the chisel with the hammer to separate the tiles from the wall.
1 most grouts call for you to mix the entire bag all at once so if you re only measuring out half the bag at a time you can end up.
Use tile spacers on the horizontal grout lines to stop the tile from sliding or droping.
Spread the mortar using the notched edge of the trowel.
Or if you have time.
After all the penalty for poorly installed wall tile is a lifetime of having to look at the stuff.
Start with a level ledger lay one wall at a time.
9 clean up after grouting.
Step 1 the easiest way to measure for cutting is using the last whole one in the row hold a tile over it place another against the wall and then mark they overlap in felt tip pen.
In my experience with a 4 x4 tile you can use a premixed mastic glue as long as you read the directions and make sure that it is water and mould proof.
The wall tile is 10x16 with 1 16 spacing.
7 prepare the installation for grouting.
10 complete the installation and maintain as needed.
4 mix and apply the tile mortar.
Obviously you ll only be spreading mortar on one tile at a time.
I think this may be problematic because of the narrow elements at the bottom of the wall.
Mark where to set your first row.
The tile will be going from floor to ceiling.
However wall tile installation has its own set of rules that you dare break at your own risk.
Another method and the one employed in this tutorial is to measure the width of your wall then divide by the width of your tiles plus one space in this case 4 tiles and 1 8 spaces means 4 1 8 required per column.
This technique is called back buttering.
In this instance the 18 foot long by 24 inch tall winding wall of concrete is being inset with 40 individually fired 40 animal tiles that have the names of their sponsors etched in other pieces.
8 mix and apply grout.
6 set mesh backed mosaic tile sheets.
2 prepare the substrate to receive tile.
5 set the tile.
It is slightly sloped to one side with 3 8 per 5 5 ft of the wall.
Then finish off the wall with the cut tiles needed for the gaps.
Use a chisel and hammer if you need to remove existing tiles.
After laying all the mortar its now time to start tiling the shower including the wall and the floor.
This will result in a perfectly symmetrical tile job.